Friday, July 18, 2025
  • Login
Forbes 40under40
  • Home
  • Technology
  • Innovation
  • Real Estate
  • Leadership
  • Money
  • Lifestyle
No Result
View All Result
  • Home
  • Technology
  • Innovation
  • Real Estate
  • Leadership
  • Money
  • Lifestyle
No Result
View All Result
Forbes 40under40
No Result
View All Result
Home Money

Want to run Green Line trains on 7th Avenue? Sorry, there’s no room

by Riah Marton
in Money
Want to run Green Line trains on 7th Avenue? Sorry, there’s no room
Share on FacebookShare on Twitter


Breadcrumb Trail Links

  1. Opinion
  2. Columnists

We might not want to build a tunnel for the Green Line … but at some point, we’re going to need a tunnel under Stephen Avenue

Published Sep 16, 2024  •  3 minute read

You can save this article by registering for free here. Or sign-in if you have an account.

Signage for the planned Green Line Shepard LRT station and maintenance depot is seen on 48th Street S.E., near 126 Avenue, in Calgary on Wednesday, July 31, 2024. The site would have been the southeast terminus of the Green Line LRT before plans were drastically cut in a July 30 city council meeting to limit the initial buildout between Eau Claire and Lynnwood/Millican stations. Brent Calver/Postmedia

Article content

Much of the recent controversy over Calgary’s troubled Green Line LRT project stems from the plan to tunnel through the city centre.

Advertisement 2

This advertisement has not loaded yet, but your article continues below.

Calgary Sun

THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY

Subscribe now to read the latest news in your city and across Canada.

  • Unlimited online access to articles from across Canada with one account and fewer ads.
  • Get exclusive access to the Calgary Sun ePaper, an electronic replica of the print edition that you can share, download and comment on.
  • Enjoy insights and behind-the-scenes analysis from our award-winning journalists.
  • Support local journalists and the next generation of journalists.
  • Daily puzzles including the New York Times Crossword.

SUBSCRIBE TO UNLOCK MORE ARTICLES

Subscribe now to read the latest news in your city and across Canada.

  • Unlimited online access to articles from across Canada with one account.
  • Get exclusive access to the Calgary Sun ePaper, an electronic replica of the print edition that you can share, download and comment on.
  • Enjoy insights and behind-the-scenes analysis from our award-winning journalists.
  • Support local journalists and the next generation of journalists.
  • Daily puzzles including the New York Times Crossword.

REGISTER / SIGN IN TO UNLOCK MORE ARTICLES

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account.
  • Share your thoughts and join the conversation in the comments.
  • Enjoy additional articles per month.
  • Get email updates from your favourite authors.

Sign In or Create an Account

or

Article content

While many of us — including myself — have developed a new reluctance to send trains underground due to the cost involved, there is no question Calgary will have to look at some kind of downtown transit tunnel in the not-too-distant future.

One only has to witness the sea of humanity using transit of late.

Back in the middle of August, at the height of the afternoon rush on a Tuesday, I was walking westward on the sidewalk on 7th Avenue gawking at the Red and Blue Line trains passing by.

At City Hall station, it was obvious trains were packed.

Behind that one was a parade of other trains, each waiting at a traffic light for the track ahead to clear so they could proceed to the next stop.

A CTrain passes through the City Hall LRT station in downtown Calgary on Thursday, February 3, 2022.
A CTrain passes through the City Hall LRT station in downtown Calgary on Thursday, February 3, 2022. Azin Ghaffari/Postmedia

For transit riders, running CTrains on the street means a slower commute because trains have to deal with traffic lights, a backlog of LRT traffic along the line, and the potential of unwanted intrusions from private vehicles and pedestrians.

opening envelope

Calgary Sun Headline News

Get the latest headlines, breaking news and columns.

By signing up you consent to receive the above newsletter from Postmedia Network Inc.

Thanks for signing up!

A welcome email is on its way. If you don’t see it, please check your junk folder.

The next issue of Calgary Sun Headline News will soon be in your inbox.

We encountered an issue signing you up. Please try again

Article content

Advertisement 3

This advertisement has not loaded yet, but your article continues below.

Article content

For the transit system itself, those same issues put a ceiling on capacity — as demonstrated by the long lineup of trains I saw waiting their turn to move forward on 7th Avenue.

The current downtown CTrain line is clearly maxed out and this can be fixed only by creating capacity with a tunnel under Stephen Avenue, as envisioned long ago, to separate the Red and Blue lines. This would also provide much-needed redundancy because currently, if anything goes wrong on 7th Avenue, the whole system is affected.

Such a project is even farther from reality than the Green Line and yet, in a letter penned on Sept. 3 by Alberta Transportation Minister Devin Dreeshan to Calgary Mayor Jyoti Gondek, the province said it intended to seek new advice on having the Green Line “integrate the red and blue lines along 7th Ave.”

Advertisement 4

This advertisement has not loaded yet, but your article continues below.

Article content

The same letter expressed disapproval for the Green Line’s downtown tunnel, with the province announcing it would no longer fund the project in its latest, truncated form.

Green Line map

It’s not been made clear what is meant by “integrating” the Green Line with existing light rail but if people are envisioning more trains on 7th Avenue … that’s not going to happen.

Even now, the trains are running slightly less often during rush hours this fall compared to summer, with Calgary Transit saying on its website the adjustment was “to improve schedule adherence.” In other words, they had been running more trains than the system could sometimes accommodate, leading to delays.

Although the province will be taking another look at how the Green Line will run through downtown, I can offer easy, free advice right now: it can’t run on 7th Avenue or at ground level, anywhere.

Advertisement 5

This advertisement has not loaded yet, but your article continues below.

Article content

The north-south city blocks are too short for stations, and the whatever road and rail congestion exists currently would be exacerbated by even more light rail operating at grade.

If we are not interested in tunnelling for the Green Line, we are only left with an elevated rail solution.

Crossing over the Bow River and traversing the CPKC tracks south of downtown will demand bridges in this case, so why not keep it above ground after reaching the city centre?

If any Plus 15s or Plus 30s are in the way, they can be rebuilt or integrated into new stations.

As for noise, one of the main reasons this option was dismissed earlier, there are technological solutions to dampen unwanted sounds. Even now, you’ll find buildings built — and being built — right up against the Blue Line’s elevated guideway in Sunalta, for example.

Calgary’s Green Line has been studied over and over again. The data exists to explain what options exist and why certain decisions were made. If governments are intent on building this transit line, there is no need to waste time and money on more studies.

Just get it done.

rleong@postmedia.com

Recommended from Editorial

Article content

Share this article in your social network

Tags: 7thAvenueGreenLineRoomRuntrains
Riah Marton

Riah Marton

I'm Riah Marton, a dynamic journalist for Forbes40under40. I specialize in profiling emerging leaders and innovators, bringing their stories to life with compelling storytelling and keen analysis. I am dedicated to spotlighting tomorrow's influential figures.

Next Post
ECB should keep cutting rates gradually, Lane says

ECB should keep cutting rates gradually, Lane says

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Forbes 40under40 stands as a distinguished platform revered for its commitment to honoring and applauding the remarkable achievements of exceptional individuals who have yet to reach the age of 40. This esteemed initiative serves as a beacon of inspiration, spotlighting trailblazers across various industries and domains, showcasing their innovation, leadership, and impact on a global scale.

 
 
 
 

NEWS

  • Forbes Magazine
  • Technology
  • Innovation
  • Money
  • Leadership
  • Real Estate
  • Lifestyle
Instagram Facebook Youtube

© 2024 Forbes 40under40. All Rights Reserved.

  • About Us
  • Advertise
  • Contact Us
No Result
View All Result
  • Home
  • Technology
  • Innovation
  • Real Estate
  • Leadership
  • Money
  • Lifestyle

© 2024 Forbes 40under40. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In