Friday, July 18, 2025
  • Login
Forbes 40under40
  • Home
  • Technology
  • Innovation
  • Real Estate
  • Leadership
  • Money
  • Lifestyle
No Result
View All Result
  • Home
  • Technology
  • Innovation
  • Real Estate
  • Leadership
  • Money
  • Lifestyle
No Result
View All Result
Forbes 40under40
No Result
View All Result
Home Money

Leong: How can Calgary build a CTrain tunnel downtown?

by Riah Marton
in Money
Leong: How can Calgary build a CTrain tunnel downtown?
Share on FacebookShare on Twitter


Breadcrumb Trail Links

  1. Opinion
  2. Columnists

Stephen Avenue subway remains a dream — but it’s a dream that comes with an instruction manual

Published Dec 02, 2024  •  3 minute read

You can save this article by registering for free here. Or sign-in if you have an account.

A CTrain passes city hall on 7th Avenue S. in Calgary on Tuesday, December 7, 2021. Gavin Young/Postmedia file

Article content

As we eagerly await a provincially commissioned report expected this month offering a new alignment for the Green Line LRT through downtown Calgary, one option is clearly off the table.

Advertisement 2

This advertisement has not loaded yet, but your article continues below.

Calgary Sun

THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY

Subscribe now to read the latest news in your city and across Canada.

  • Unlimited online access to articles from across Canada with one account and fewer ads.
  • Get exclusive access to the Calgary Sun ePaper, an electronic replica of the print edition that you can share, download and comment on.
  • Enjoy insights and behind-the-scenes analysis from our award-winning journalists.
  • Support local journalists and the next generation of journalists.
  • Daily puzzles including the New York Times Crossword.

SUBSCRIBE TO UNLOCK MORE ARTICLES

Subscribe now to read the latest news in your city and across Canada.

  • Unlimited online access to articles from across Canada with one account.
  • Get exclusive access to the Calgary Sun ePaper, an electronic replica of the print edition that you can share, download and comment on.
  • Enjoy insights and behind-the-scenes analysis from our award-winning journalists.
  • Support local journalists and the next generation of journalists.
  • Daily puzzles including the New York Times Crossword.

REGISTER / SIGN IN TO UNLOCK MORE ARTICLES

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account.
  • Share your thoughts and join the conversation in the comments.
  • Enjoy additional articles per month.
  • Get email updates from your favourite authors.

THIS ARTICLE IS FREE TO READ REGISTER TO UNLOCK.

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account
  • Share your thoughts and join the conversation in the comments
  • Enjoy additional articles per month
  • Get email updates from your favourite authors

Sign In or Create an Account

or

Article content

Article content

Article content

The reason this report is even being compiled is due to a recent surge of opposition to the previously proposed tunnel sections in the city centre.

While we might be currently feeling cost- and risk-averse, Calgary along with its provincial and federal partners will eventually be confronted with having to move some of the CTrain system underground.

As I’ve previously explained, the current setup for trains on the Blue and Red lines is maxed out, with no possibility of redundancy and resiliency for service downtown.

Four-car trains are currently sidelined due to infrastructure work but once those return to service, Calgary Transit will be short of options to increase service. Just as the city continues to grow, passenger numbers have rebounded from COVID-19 pandemic lows.

opening envelope

Calgary Sun Headline News

Get the latest headlines, breaking news and columns.

By signing up you consent to receive the above newsletter from Postmedia Network Inc.

Thanks for signing up!

A welcome email is on its way. If you don’t see it, please check your junk folder.

The next issue of Calgary Sun Headline News will soon be in your inbox.

We encountered an issue signing you up. Please try again

Article content

Advertisement 3

This advertisement has not loaded yet, but your article continues below.

Article content

Any future increase in capacity downtown will necessarily come from an underground component, given the foregone conclusion that the Green Line will be built through the city centre without a subway.

Calgary Stephen Avenue
A rapid transit tunnel under Stephen Avenue in downtown Calgary has been envisioned at least as far back as 1970, when a report explained how such a thing could be built. Gavin Young/Postmedia file

Stephen Avenue subway proposed … more than 50 years ago

Luckily, preliminary investigations were done more than five decades ago for a proposed tunnel under Stephen Avenue to accommodate what was then a planned rapid transit system.

A portion actually got built, starting near the Victoria Park/Stampede Station, passing under the Canadian Pacific Kansas City tracks and ending at the Central Library.

There’s also short spur veering west from the tunnel heading toward Stephen Avenue. If you take the CTrain and peer toward the west side of the tunnel, you’ll see the blocked entrance.

Advertisement 4

This advertisement has not loaded yet, but your article continues below.

Article content

But as for the rest, it remains a pipe dream for now — but a dream that comes with an instruction manual worth highlighting and learning from.

The June 1970 report, titled Feasibility of the Underground Section of the Proposed Rapid Transit System, suggested a shallow tunnel under Stephen Avenue built by cut-and-cover, noting all the potential issues and disruptions this could entail.

Of the challenges the report’s authors highlighted, including concerns about the sturdiness of building basements and potential intrusions into the subway’s right-of-way, groundwater appeared to be the most complicated.

“There is a large degree of uncertainty as to the severity of the groundwater problem, and conservative assumptions must be made at this preliminary stage,” the report stated. “Special measures will have to be taken during construction to reduce infiltration rates and remove water from the excavation.”

Advertisement 5

This advertisement has not loaded yet, but your article continues below.

Article content

More testing would be needed, the report added. As for what to do about the water once construction was complete, it had this to say: “It is felt that it is not necessary to fully waterproof the structure, as a moderate amount of water infiltration in the tunnel is acceptable.

“In the stations it is important to avoid any signs of water infiltration. This can be easily accomplished by finishing the station areas with a ceiling and wall cover which will divert any water leakage to drains at the sides of the tunnels.”

Calgary downtown CTrain tunnel report
A report published in 1970 shares details about how a tunnel under Stephen Avenue could be constructed, including pros and cons on construction methods and potential problems that would require further study and work. This copy of the document is stored in one of the reference sections at the Central Library.

Problem isn’t engineering and construction, but having a plan

It’s been 54 years since this report was published and a lot has changed.

The streetscape has evolved has along the proposed tunnel’s path.

Design standards have also improved, particularly when it comes to accessibility. New above-ground or underground stations would need elevators, for example.

Advertisement 6

This advertisement has not loaded yet, but your article continues below.

Article content

A lot of real life has happened as well: The 2013 flood was very instructive about the impact of high water on the city centre and how we can prevent this in the first place.

As a result, costs for a tunnel under Stephen Avenue might be higher than previously imagined. Excluding expropriations and demolition, it was believed this could be built for $20.2 million. Adjusted for inflation, that would be about $160 million in 2024. This seems wildly optimistic.

It’s clearly possible to build and maintain complicated infrastructure below grade, given that we already have short rail tunnels and larger underground parkades all over downtown Calgary.

The stumbling block isn’t engineering or construction, but rather the articulation of a clear project vision and a realistic price tag to execute any kind of downtown transit tunnel.

Coincidentally, these might have been the Green Line’s greatest weaknesses.

Recommended from Editorial

Article content

Share this article in your social network

Tags: BuildCalgaryCTraindowntownLeongTunnel
Riah Marton

Riah Marton

I'm Riah Marton, a dynamic journalist for Forbes40under40. I specialize in profiling emerging leaders and innovators, bringing their stories to life with compelling storytelling and keen analysis. I am dedicated to spotlighting tomorrow's influential figures.

Next Post
St James’s Place to cut around 500 jobs, source says

St James's Place to cut around 500 jobs, source says

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Forbes 40under40 stands as a distinguished platform revered for its commitment to honoring and applauding the remarkable achievements of exceptional individuals who have yet to reach the age of 40. This esteemed initiative serves as a beacon of inspiration, spotlighting trailblazers across various industries and domains, showcasing their innovation, leadership, and impact on a global scale.

 
 
 
 

NEWS

  • Forbes Magazine
  • Technology
  • Innovation
  • Money
  • Leadership
  • Real Estate
  • Lifestyle
Instagram Facebook Youtube

© 2024 Forbes 40under40. All Rights Reserved.

  • About Us
  • Advertise
  • Contact Us
No Result
View All Result
  • Home
  • Technology
  • Innovation
  • Real Estate
  • Leadership
  • Money
  • Lifestyle

© 2024 Forbes 40under40. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In