Saturday, July 19, 2025
  • Login
Forbes 40under40
  • Home
  • Technology
  • Innovation
  • Real Estate
  • Leadership
  • Money
  • Lifestyle
No Result
View All Result
  • Home
  • Technology
  • Innovation
  • Real Estate
  • Leadership
  • Money
  • Lifestyle
No Result
View All Result
Forbes 40under40
No Result
View All Result
Home Money

Why the Green Line and other transit projects have seen costs soar

by Riah Marton
in Money
Why the Green Line and other transit projects have seen costs soar
Share on FacebookShare on Twitter


Breadcrumb Trail Links

  1. Opinion
  2. Columnists

Research paper finds common missteps can led to sticker shock for major transit infrastructure and explains how such problems can be avoided

Published Dec 16, 2024  •  Last updated 53 minutes ago  •  3 minute read

You can save this article by registering for free here. Or sign-in if you have an account.

A mockup of Urbos 100, the Green Line’s low floor Light Rail Vehicle (LRV) is shown on Nov. 29, 2022. Photo by Jim Wells /Postmedia

Article content

In a much-anticipated announcement, the province on Friday unveiled its choice for a new downtown Calgary alignment for the Green Line LRT project.

Advertisement 2

This advertisement has not loaded yet, but your article continues below.

Calgary Sun

THIS CONTENT IS RESERVED FOR SUBSCRIBERS ONLY

Subscribe now to read the latest news in your city and across Canada.

  • Unlimited online access to articles from across Canada with one account and fewer ads.
  • Get exclusive access to the Calgary Sun ePaper, an electronic replica of the print edition that you can share, download and comment on.
  • Enjoy insights and behind-the-scenes analysis from our award-winning journalists.
  • Support local journalists and the next generation of journalists.
  • Daily puzzles including the New York Times Crossword.

SUBSCRIBE TO UNLOCK MORE ARTICLES

Subscribe now to read the latest news in your city and across Canada.

  • Unlimited online access to articles from across Canada with one account.
  • Get exclusive access to the Calgary Sun ePaper, an electronic replica of the print edition that you can share, download and comment on.
  • Enjoy insights and behind-the-scenes analysis from our award-winning journalists.
  • Support local journalists and the next generation of journalists.
  • Daily puzzles including the New York Times Crossword.

REGISTER / SIGN IN TO UNLOCK MORE ARTICLES

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account.
  • Share your thoughts and join the conversation in the comments.
  • Enjoy additional articles per month.
  • Get email updates from your favourite authors.

THIS ARTICLE IS FREE TO READ REGISTER TO UNLOCK.

Create an account or sign in to continue with your reading experience.

  • Access articles from across Canada with one account
  • Share your thoughts and join the conversation in the comments
  • Enjoy additional articles per month
  • Get email updates from your favourite authors

Sign In or Create an Account

or

Article content

Article content

Article content

Alas, apart from being able to say what streets it will run on, where the line will ends and it will be built entirely above ground — the latter being a foregone conclusion — there was not much new to share on the $6.2-billion endeavour, not even an engineering report.

This lack of openness is just one of the symptoms plaguing some new public transportation infrastructure in many parts of the world where, as it is with the beleaguered Green Line, costs have risen wildly not only over the life of any given project but also for projects in general over the span of decades.

And while a new paper by Jedwin Mok, Balthazar Crane, Marco Chitti, Amer Shalaby for the University of Toronto’s School of Cities doesn’t mention the Green Line, some of the problems they outlined are eerily familiar.

opening envelope

Calgary Sun Headline News

Get the latest headlines, breaking news and columns.

By signing up you consent to receive the above newsletter from Postmedia Network Inc.

Thanks for signing up!

A welcome email is on its way. If you don’t see it, please check your junk folder.

The next issue of Calgary Sun Headline News will soon be in your inbox.

We encountered an issue signing you up. Please try again

Article content

Advertisement 3

This advertisement has not loaded yet, but your article continues below.

Article content

Green Line
Signage for the Green Line LRT can be seen along the route near the proposed Ogden Station in Calgary on Tuesday, Oct. 15, 2024. Brent Calver/Postmedia

International transit projects show how to contain costs

“Our study contends that high transit construction costs are not an inevitability; rather, they are the result of a project delivery regime antithetical to global best practices,” wrote the three transit planner and one engineer who co-authored Understanding the Driver of Transit Construction Costs in Canada: A Comparative Study, published on Dec. 4.

The study identified a rise in the cost of many transit projects well beyond the rate of inflation in Canada, the United States, Hong Kong, Singapore, the United Kingdom and Australia over the past 25 years.

That said, some projects within Canada — Vancouver’s Canada Line SkyTrain, Kitchener-Waterloo’s ION light rail and Montreal’s REM light metro — fared much better in terms of cost. Meanwhile, transit projects in Italy, Spain, South Korea and Turkey held steady relative to inflation over the same time period, the authors found.

Advertisement 4

This advertisement has not loaded yet, but your article continues below.

Article content

First, we may be making things too complicated for no good reason.

The report found the construction cost of a fully underground automated metro system in Milan was about one-third less per kilometre than some simpler ground-level tram projects in Canada.

“Canadian transit agencies tend to overbuild in multiple ways, with larger and deeper tunnels and stations — a result of greater risk aversion,” the paper’s authors wrote.

This is partly due to “stricter interpretations of global safety standards than other, more cost-effective jurisdictions.”

Recommended from Editorial

Project procurement practices can lead to headaches

Advertisement 5

This advertisement has not loaded yet, but your article continues below.

Article content

They also singled out routing and construction choices made to appease locals — tunnelling deep to avoid causing disruptions, for example. “However, these often come at high cost,” the paper said, highlighting savings from shallow tunnelling or above-ground options.

The authors went on to criticize procurement, arguing work is being offloaded to external consultants too early in the process, before projects are fully scoped and properly priced.

They also argued keeping more work within the public sector would allow for better knowledge retention, leading to cost savings thanks to improved institutional memory.

“Advancing project design in-house empowers civil servants to take ownership of and make decisions on projects, increasing cost confidence and controlling soft costs by minimizing change orders and delays,” the paper argued.

Advertisement 6

This advertisement has not loaded yet, but your article continues below.

Article content

Green Line
A Calgary Transit bus passes a sign advertising the route of the proposed LRT Green Line at the corner of 21st Avenue and 11th Street S.W. Brent Calver/Postmedia

Study authors frown upon lack of transparency

The study also took aim at budget contingencies. The authors found some instances of emergency reserves being used as line items for expected spending.

“The continuously escalating per-kilometre costs in Canada indicate a persistent trend of overpadding,” they wrote.

The authors were also critical of practices that hide information from the public.

“Low-cost jurisdictions emphasize public transparency, enabling more cost-effective planning and decision-making. They avoid lump-sum contracts that make costs opaque and change orders more difficult to track,” they continued. “In comparison, high-cost jurisdictions like New York and Toronto consider cost estimates to be akin to trade secrets, citing their commercial sensitivity to prevent public disclosure.”

Not always following global best practices led to the trouble we’ve seen with the Green Line since before Day 1 — an sometimes ill-defined initial concept coupled with occasional opaque management practices, leading to escalating costs and continual reductions in project scope.

With hope, it’s not too late to start doing things right.

rleong@postmedia.com

Article content

Share this article in your social network

Tags: CostsGreenLineProjectsSoarTransit
Riah Marton

Riah Marton

I'm Riah Marton, a dynamic journalist for Forbes40under40. I specialize in profiling emerging leaders and innovators, bringing their stories to life with compelling storytelling and keen analysis. I am dedicated to spotlighting tomorrow's influential figures.

Next Post
2024 KBS Song Festival: Date, Venue, Hosts, Performers, Streaming Details, and More

2024 KBS Song Festival: Date, Venue, Hosts, Performers, Streaming Details, and More

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Forbes 40under40 stands as a distinguished platform revered for its commitment to honoring and applauding the remarkable achievements of exceptional individuals who have yet to reach the age of 40. This esteemed initiative serves as a beacon of inspiration, spotlighting trailblazers across various industries and domains, showcasing their innovation, leadership, and impact on a global scale.

 
 
 
 

NEWS

  • Forbes Magazine
  • Technology
  • Innovation
  • Money
  • Leadership
  • Real Estate
  • Lifestyle
Instagram Facebook Youtube

© 2024 Forbes 40under40. All Rights Reserved.

  • About Us
  • Advertise
  • Contact Us
No Result
View All Result
  • Home
  • Technology
  • Innovation
  • Real Estate
  • Leadership
  • Money
  • Lifestyle

© 2024 Forbes 40under40. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In